So what does the real Lay Up Malaysia procedure entail?

What is Dry-docking as well as why do we do it?
The process of dry-docking refers to when a vessel is required to the service backyard and brought to dry land so that submerged parts of the hull can be cleaned and examined. This work is both preventative in addition to a governing need within the industry. When used bought vessels are due for dry-docking, they are rebranded and analyzed to fulfill all Teekay requirements.

At Teekay, vessels are set up for dry-docking once every five years, with intermediate surveys taking place in between. Once the vessels are put back right into service, they are much more eco-friendly as well as fuel-efficient. At its core, the process of dry-docking is about our dedication to Functional Management as well as our pledge to run the most effective ships in the market.

If the world of dry-docking had one moto, it would be “plan, plan, plan as well as intend some more.”

In 2015, the Teekay Tankers group finished the biggest dry-docking program to date, efficiently processing 17 vessels over the course of 382 days of service time. The process itself needs mindful preparation and also prep work. Every minute information needs to be thought about when embarking on a significant job such as the dry-docking of a vessel– and much more so when trying to collaborate 17 of them in a year.

So what does the real dry-docking procedure entail? Let’s look:

 

Arrival at Lawn as well as Entering the Dry-dock
After finishing all necessary primary work, the vessel arrives at the shipyard. On conclusion of port procedures, the vessel continues to the dry-dock with support from pull watercrafts as well as shipyard employees. Prior to this, the blocks are set up by the shipyards as per each vessel’s certain docking plan.

Pumping Down the Dock and Vessel “Taking” the Blocks
The water is drained pipes from the dry-dock (typically over night) over the course of about eight to ten hrs, depending on the dimension of the vessel. Prior to the vessel is hinged on the block, specialized dive teams make certain the block frameworks remain in the correct location.

Ranging the Cables
The cables (or anchor chains) are varied on the dock base once the dock is dry. Supports Lay Up Malaysia as well as cables are then checked as well as measured to determine the top quality/ problem as well as malfunctioning parts are repaired or changed as needed.

Hull Paint
The hull painting consists of cleaning, blasting and painting of the vessel and also is one of the major factors for dry-docking, as it makes sure effective vessel procedures for the following 5 years. After extended durations of sailing as well as solution, it is not uncommon for marine growth such as algae or sludge to develop on the sides of the vessel. This buildup has a direct influence on the efficiency of the vessel and inevitably brings about higher fuel consumption.

WASHING
Shipyard employees utilize (fresh water) high-pressure washers to get rid of aquatic growth and chlorides from the ship side.

BLOWING UP
Blasting is done largely to eliminate rust or faulty paint from the ship side. Relying on the need of each vessel, blowing up may be local or executed along the entire side of the vessel. In this process, old paint in the defective locations is eliminated entirely to reveal the bare steel.

Lay Up Malaysia

PAINTING
When the blasting is completed, the whole vessel is cleansed and painted to shield the stability of the steel as well as avoid future deterioration. The undersea side is painted with anti-fouling paint to prevent aquatic growth and makes certain vessel operates close to its original style speed and also gas intake.

Opening Sea Chests and Overhaul of Sea Valves
The Lay Up Malaysia is a recess in the hull of the ship that offers intake of sea water for the air conditioning systems in the engine space. This area is opened throughout the dry-docking process for cleaning, checking and painting. At the same time, all ship-side sea shutoffs are examined and overhauled as required.

Essential Services as well as Upkeep
During this period, groups take the opportunity to lug our maintenance deal with engines, pumps, tanks and also freight areas as required. Repair work on the tail, propeller or shafting are made if any type of issues are determined.

Flooding the Dock
Besides intended job has actually been satisfactorily finished, the dock is swamped and planned for the vessel’s separation.

Departure and Trials
The vessel is hauled out of the dry-dock with the assistance of yanks and shipyard personnel. As soon as the vessel gets to a safe anchorage area, sea tracks are executed to confirm the procedure of all ship’s machinery. On completion of sea tests, the vessel is appointed back into service.